In 2015, our company was once again awarded the contract for the Messer Group’s CO₂ recovery project. This project utilizes the exhaust gas generated after the low-temperature methanol stripping process in coal gasification to produce food-grade CO₂. Our company was responsible for the preliminary engineering design, equipment supply, and technical services. The project entered commissioning in February 2017 and was completed and put into operation in early March 2017. All performance indicators exceeded design requirements, and quality standards surpassed those of the national food-grade CO₂ standard (GB10621-2016).
The President of Messer Group and the General Manager of Messer China, along with our General Manager Shen Jianchong, took a photo together